Operations

Moving Your Placement Cell Off Spreadsheets: A 30-Day Plan

A 30-day plan for moving a college placement cell from spreadsheets and forms to a placement platform: data clean-up, policy set-up, a pilot drive and training.

Spreadsheets got your placement cell this far. But as batches grow, the cost of re-typing data, reconciling versions and rebuilding reports every year keeps rising. Moving to a dedicated platform doesn’t have to disrupt a season. Here is a plan that fits into a month.

Week 1: Gather and clean

  • Collect the current final-year list from the university: roll number, name, university email, programme, branch and passing year.
  • Collect past placement records for at least three batches, if you have them.
  • Agree on one spelling for every programme and branch.

Week 2: Configure

  • Set up programmes and branches, and the placement policy exactly as your circular states.
  • Agree hiring-process templates for common drive types.
  • Decide who approves exceptions and opt-outs.

Week 3: Import and verify

  • Import students and past records; review the rows flagged for fixing.
  • Invite students to activate and check their records.
  • Handle corrections with evidence, not phone calls.

Week 4: Pilot a real drive

  • Run one upcoming drive end to end on the new platform.
  • Collect feedback from the team, students and the recruiter.
  • Train the remaining staff on the workflow they will use.
Run the first drive in parallel with your old process if it reassures the team. Most cells stop the parallel run after one drive.

Marquee’s migration wizard maps your columns, shows a dry run before anything is saved, and can undo an import. See data migration.

See your next placement season in Marquee

A 30-minute walkthrough with your placement data model, your policy and your reports, and a pilot plan you can take to your leadership.